2006 harvest plans
This plan includes a list of native forest coupes which are planned to be harvested in full or in part during 2006, and is designed to provide sawlog and other timber supply requirements in line with the Forest Management Plan 2004 -2013 (specifically Action 11.3).
The harvest plan comprises a list of new coupes (below) and supporting maps.
The majority of these coupes were identified in the Three year (2005 to 2007) indicative harvest plan released for public comment more than 12 months ago by the Department of Environment and Conservation.
Minor modifications to the 2006 plan, including final operational boundaries in individual coupes, may be made as detailed planning progresses.
The coupe list below does not include coupes carried forward from previous annual harvest plans – these are included in details of the plan that are available on the Forest Products Commission website, or upon request.
For questions or queries regarding harvest plans, please contact:
The Consultation Coordinator
Forest Products Commission
Locked Bag 6
MANJIMUP WA 6258
Telephone: +61 (08) 9777 0988
Facsimile: +61 (08) 9777 2233
Email: info@fpc.wa.gov.au
Coupe list
South West region
- Full coupe details, including carryover coupes and indicative total sawlog volumes
- Download coupe map (1.38MB PDF)
New coupes
- Balmoral 4*
- Duncan 3
- Wungong catchment
Swan region
- Full coupe details, including carryover coupes and indicative total sawlog volumes
- Download coupe map (737kB PDF)
New coupes
- Balmoral 4*
- Duncan 3
- Wungong catchment *
Warren region
- Full coupe details, including carryover coupes and indicative total sawlog volumes
- Download coupe map (1.25MB PDF)
New coupes
- Brockman 6 ®
- Brockman 7 ®
- Brockman 9®*
- Brockman 9®
- Brockman 9®*
- Channybearup 7*
- Crowea 1®
- Crowea 6
- Crowea 10
- Crowea 12®
- Diamond 2 14
- Dombakup 4®
- Dombakup 6®
- Dombakup 18®
- Dombakup 19®
- Gray 5®
- Mindanup 6
- Nairn 3
- Sutton 3
- Warren 1®
- Warren 4®
- Weld 1®
- Weld 3®
- Weld 4®
- Wheatley 1
- Wheatley 7
Note 1: Timber harvesting will also occur in advance of mining operations in some localities.
Note 2: All harvested areas other than mining pods are planned for forest regeneration within two years.
® Coupes comprised of young regrowth karri, scheduled for first thinning operations.







